New article available
Rental Chiller

If Cooling Stops,
Production Must Not.

A chiller failure is sometimes more than a technical problem. It can mean halted production, rising process temperatures, product loss, data center risk, or a critical facility left without cooling. In such cases, what the business needs is not to buy a new machine; it is to restore cooling at the right capacity as quickly as possible. Özsayın offers rental chiller solutions in a range of capacities and configurations for the temporary and emergency cooling needs of industrial facilities.

50 kW – 2,500 kW · Emergency · Seasonal demand · Planned maintenance · Temporary capacity · Project-based rental
Process

Rent Temporary Cooling Capacity, Not Just a Chiller.

Rental is more than shipping a machine to site. If capacity selection, hydraulic connections, electrical infrastructure, operating temperatures and site conditions are not properly evaluated, the rented unit may not deliver the expected performance. For this reason, Özsayın treats each rental operation as a Temporary Cooling project.

01

Defining the Requirement

Required cooling capacity, inlet/outlet water temperatures, flow rate, ambient temperature and process conditions are determined.

02

Selecting the Right Chiller

The capacity and configuration suited to the application are selected from the rental systems in stock.

03

Site Planning

Electrical supply, piping, pump requirements, connection points and unit placement are evaluated.

04

Logistics

Delivery of the unit to site and the operation schedule are planned.

05

Connection & Commissioning

On request, mechanical and electrical connections are made and the system is commissioned.

06

Operational Support

Technical support and, when needed, on-site intervention are provided throughout the rental period.

Use Cases

When Should You Rent a Chiller?

Emergency Breakdown

If your existing chiller goes out of service unexpectedly, temporary cooling capacity keeps production or facility operations running.

Planned Maintenance & Overhaul

While the main chiller is undergoing maintenance or overhaul, the facility's cooling demand can be met with a rental system.

Seasonal Capacity Increase

In summer months or periods of peak production, additional load that the existing system cannot cover can be supported temporarily.

New Facility & Commissioning

A temporary chiller can be used to start production until the permanent cooling system is commissioned.

Project-Based Cooling

For concrete, plastics, food, pharmaceuticals, energy, test systems and special processes, only the capacity needed for the duration of the project can be rented.

Critical Facility Backup

In hospitals, data centers and facilities requiring uninterrupted processes, temporary backup cooling infrastructure can be installed during planned works.

CAPEX vs OPEX

Buying Is Not Always the Right Decision.

For a short- or medium-term cooling need, buying a new chiller can mean high CAPEX, long lead times and idle capacity once the project ends. The rental model lets you use the capacity you need only for as long as you need it.

OPEX instead of CAPEX.Flexible capacity instead of permanent investment.Fast operation instead of months-long lead times.
Modular Capacity

From a Single Chiller to a Temporary Cooling Plant

In high-capacity projects the solution is not limited to a single unit. Several chillers can be operated in parallel to form a temporary cooling plant. For example, modular systems such as 300 kW + 500 kW + 700 kW can build up the total capacity suited to the process requirement. This approach can also provide N+1 redundancy, staged capacity control and operational flexibility.

Quick Request

Just 6 Pieces of Information Before You Rent.

1Required capacity — kW
2Water inlet / outlet temperature — °C
3Estimated flow rate — m³/h
4Site location / city
5Rental period
6Application — process / HVAC / emergency

If you do not know the capacity, that is not a problem. Share your process details; the Özsayın engineering team will calculate the required capacity.

Production Cannot Wait.

While your permanent solution is being prepared, while your existing chiller is under overhaul, or when an unexpected failure occurs, you do not have to lose your cooling capacity. Bring the capacity you need online temporarily with Özsayın's rental chiller fleet and engineering support.